You have submitted an FOI request
Date: April 21, 2018, 2:19 p.m.
Your request is already in review
Your request was denied
Date: 2018-05-03 14:33:12.000000
How was your request?
Published by Department of Transportation(DOTr) on April 21, 2018.
Requested from DOTr by C. Esquivel at 02:19 PM on
April 21, 2018.
Purpose: Academic Research
Date of Coverage: 04/21/2018 - 04/21/2018
Tracking no: #DOTr-425131736616
Hi I would like to request the following: 1) Details of ITS - South Terminal -- location, developer, budget, capacity, etc 2) Details of ITS - Southwest Terminal -- location, developer, budget, capacity, etc 3) architectural details (both) - capacity, space requirements, plans (if possible), innovations, etc
As discussed with representative of MWM Terminals, Inc., the private partner of DOTr for the construction and operation of the Parañaque Integrated Transport Exchange (formerly known as Southwest ITS), your request should be directly lodged to the MWM Terminals, Inc. Same with Taguig ITX (formerly known as South ITS), the project is still in its Detailed Engineering Design Stage. The private contractor is the Makati Development Corporation. Please lodged your request directly to them. DOTr is not allowed to divulge information unless given permission by these contractors.