You have submitted an FOI request
Date: Sept. 20, 2022, 1:10 p.m.
Your request is already in review
Your request was denied
Date: 2022-09-20 13:16:05.000000
How was your request?
Published by Environmental Management Bureau(DENREMB) on Sept. 20, 2022.
Requested from DENR EMB by B. Fabro Jr at 01:10 PM on
Sept. 20, 2022.
Purpose: Architecture Thesis
Date of Coverage: 01/01/2019 - 08/11/2022
Tracking no: #DENREMB-793350543679
Good day! I would only like to ask if there exists a new/updated file of the previous 2019 PRRC Water Hyacinth Control Guidelines In line with my architecture thesis, I'd also like to ask of the following data: 1.) Seasonal/monthly volume of Water Hyacinth (during rainy and dry seasons) 2.) Needed/Required Water Hyacinth Harvester Boats to sufficiently control water Hyacinth 3.) Latest Waste/trash volume in Pasig River 3.) Equipment, space allocation/design requirements for Water Hyacinth processing for Handicrafts/charcoal briquettes 4.) Source location of Water Hyacinth growth
Automatic Denial.