impact of extreme temperatures on solar power generation

Published by Energy Regulatory Commission(ERC) on Oct. 20, 2023.
Requested from ERC by J. Bumanglag at 01:45 AM on Oct. 20, 2023.
Purpose: Research/thesis
Date of Coverage: 01/01/2014 - 12/31/2022
Tracking no: #ERC-644233601673

ERC Case No. 2022-028 RC

Published by Energy Regulatory Commission(ERC) on Oct. 18, 2023.
Requested from ERC by A. Ong at 09:30 PM on Oct. 18, 2023.
Purpose: Research
Date of Coverage: 01/01/2022 - 10/18/2023
Tracking no: #ERC-317830861806

Request for the updated list of 2023 Contestable Customers

Published by Energy Regulatory Commission(ERC) on Oct. 18, 2023.
Requested from ERC by A. Barawel at 03:48 PM on Oct. 18, 2023.
Purpose: For Technical and Market Research
Date of Coverage: 07/01/2022 - 10/18/2023
Tracking no: #ERC-468835802991

ERC CASE NOS. 2023-107 SC & 2023-108 SC

Published by Energy Regulatory Commission(ERC) on Oct. 18, 2023.
Requested from ERC by J. Francia at 01:05 PM on Oct. 18, 2023.
Purpose: For my research paper on Electric Cooperatives
Date of Coverage: 05/01/2023 - 05/31/2023
Tracking no: #ERC-981195351315

Competitive Retail Electricity Market (CREM) Report

Published by Energy Regulatory Commission(ERC) on Oct. 17, 2023.
Requested from ERC by J. Urbano at 03:34 PM on Oct. 17, 2023.
Purpose: Research and Development
Date of Coverage: 03/31/2023 - 08/31/2023
Tracking no: #ERC-228531049196

2021 System Loss of Private Distribution Utilities & Electric Cooperatives

Published by Energy Regulatory Commission(ERC) on Oct. 15, 2023.
Requested from ERC by J. Jumalon at 12:54 PM on Oct. 15, 2023.
Purpose: Research
Date of Coverage: 01/01/2019 - 09/20/2023
Tracking no: #ERC-829220836126

2020 System Loss of all Distribution Utilities

Published by Energy Regulatory Commission(ERC) on Oct. 15, 2023.
Requested from ERC by J. Jumalon at 12:51 PM on Oct. 15, 2023.
Purpose: Research
Date of Coverage: 01/01/2019 - 09/20/2023
Tracking no: #ERC-347270519034

Number of Distribution Transformers installed for PDUs and ECs

Published by Energy Regulatory Commission(ERC) on Oct. 11, 2023.
Requested from ERC by J. Jumalon at 06:59 PM on Oct. 11, 2023.
Purpose: Research for school
Date of Coverage: 01/01/2019 - 09/20/2023
Tracking no: #ERC-731843189291

Annual Electricity Consumption in Ozamis City/Misamis Occidental

Published by Energy Regulatory Commission(ERC) on Oct. 11, 2023.
Requested from ERC by M. Saumat at 11:27 AM on Oct. 11, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2020 - 10/11/2023
Tracking no: #ERC-830326642558

Gen Rates of the PSALM-STEAG power plant

Published by Energy Regulatory Commission(ERC) on Oct. 11, 2023.
Requested from ERC by A. None at 09:23 AM on Oct. 11, 2023.
Purpose: CIF ACT assessment
Date of Coverage: 01/01/2020 - 10/11/2023
Tracking no: #ERC-916657789658



Reliability Indices (SAIFI and SAIDI) of Electric Distribution Utilities in the Philippines

Published by Energy Regulatory Commission(ERC) on Oct. 10, 2023.
Requested from ERC by J. Heraña at 08:23 AM on Oct. 10, 2023.
Purpose: Research Study
Date of Coverage: 01/01/2017 - 12/31/2022
Tracking no: #ERC-678864019336

Approved Rates for BESS

Published by Energy Regulatory Commission(ERC) on Oct. 9, 2023.
Requested from ERC by J. Urbano at 03:16 PM on Oct. 9, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2022 - 10/09/2023
Tracking no: #ERC-510801348566

List of Contestable Costumer Directly Connected to NGCP as October 2023

Published by Energy Regulatory Commission(ERC) on Oct. 9, 2023.
Requested from ERC by P. Roldan at 12:36 PM on Oct. 9, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2010 - 10/01/2023
Tracking no: #ERC-248305246900

Contestable Markets 2023

Published by Energy Regulatory Commission(ERC) on Oct. 3, 2023.
Requested from ERC by R. Sumang at 10:23 AM on Oct. 3, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2023 - 10/03/2023
Tracking no: #ERC-430809025591

comparative summary of the existing CSP guidelines and the draft CSP guidelines

Published by Energy Regulatory Commission(ERC) on Oct. 3, 2023.
Requested from ERC by C. Zalsos at 09:11 AM on Oct. 3, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2019 - 08/24/2023
Tracking no: #ERC-962919227673

The basis of secondary price cap

Published by Energy Regulatory Commission(ERC) on Oct. 2, 2023.
Requested from ERC by C. Miguel at 01:23 AM on Oct. 2, 2023.
Purpose: Research and Development
Date of Coverage: 02/02/2013 - 10/02/2023
Tracking no: #ERC-416394999307

List of Net-Metering Installations in the Philippines

Published by Energy Regulatory Commission(ERC) on Sept. 28, 2023.
Requested from ERC by J. Pagtalunan at 01:54 PM on Sept. 28, 2023.
Purpose: Reference Material for IEC Campaign
Date of Coverage: 09/28/2023 - 09/28/2023
Tracking no: #ERC-817929354652

Electricity Rates Per month for 2019 - 2023

Published by Energy Regulatory Commission(ERC) on Sept. 26, 2023.
Requested from ERC by J. Mecitas at 02:51 PM on Sept. 26, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2019 - 08/30/2023
Tracking no: #ERC-434148689708

Electricity Rates of Every City in the Philippines 2022-2023

Published by Energy Regulatory Commission(ERC) on Sept. 26, 2023.
Requested from ERC by R. Guevara at 09:28 AM on Sept. 26, 2023.
Purpose: Market Research
Date of Coverage: 01/01/2022 - 09/25/2023
Tracking no: #ERC-359783681526

List of Contestable Customers as of September 2023

Published by Energy Regulatory Commission(ERC) on Sept. 25, 2023.
Requested from ERC by A. Pastor at 04:49 PM on Sept. 25, 2023.
Purpose: Research and Development
Date of Coverage: 09/25/2022 - 09/25/2023
Tracking no: #ERC-930470634716

Investor-Owned Electric Distribution Utility Planning Manual, Energy Regulatory Commission, 2011

Published by Energy Regulatory Commission(ERC) on Sept. 23, 2023.
Requested from ERC by J. Heraña at 02:56 PM on Sept. 23, 2023.
Purpose: For research and development purposes.
Date of Coverage: 01/01/2010 - 12/31/2012
Tracking no: #ERC-834950382159

PSAs and 2020 - 2023 Gen Rates for Mindanao Coal-Fired Thermal Power Plant (CFTPP)

Published by Energy Regulatory Commission(ERC) on Sept. 21, 2023.
Requested from ERC by A. None at 07:01 PM on Sept. 21, 2023.
Purpose: CIF ACT Assessment
Date of Coverage: 01/01/2020 - 09/21/2023
Tracking no: #ERC-109025073740

Compliances in line with Provisional Authority to Operate

Published by Energy Regulatory Commission(ERC) on Sept. 21, 2023.
Requested from ERC by L. Penafiel at 09:13 AM on Sept. 21, 2023.
Purpose: Research
Date of Coverage: 09/21/2023 - 09/21/2023
Tracking no: #ERC-320705291270

Annual electricity consumption in Davao Region

Published by Energy Regulatory Commission(ERC) on Sept. 20, 2023.
Requested from ERC by J. Jumalon at 04:45 PM on Sept. 20, 2023.
Purpose: School research
Date of Coverage: 01/01/2019 - 09/20/2023
Tracking no: #ERC-068914491495

Data/Documentation on Smart Metering in the Philippines

Published by Energy Regulatory Commission(ERC) on Sept. 20, 2023.
Requested from ERC by J. Jumalon at 04:43 PM on Sept. 20, 2023.
Purpose: School research
Date of Coverage: 01/01/2019 - 09/20/2023
Tracking no: #ERC-388848717492

Data for Power Outage of the Philippines from 2019 - 2021

Published by Energy Regulatory Commission(ERC) on Sept. 20, 2023.
Requested from ERC by J. Jumalon at 04:35 PM on Sept. 20, 2023.
Purpose: School research
Date of Coverage: 01/01/2019 - 09/20/2023
Tracking no: #ERC-622368203194

Average power consumption in megawatts MW of Antipolo Rizal, Rodriguez Rizal, San Mateo Rizal and T

Published by Energy Regulatory Commission(ERC) on Sept. 20, 2023.
Requested from ERC by L. Beltran at 02:44 PM on Sept. 20, 2023.
Purpose: Research Development Thesis about Hydroelectric Power Plant
Date of Coverage: 12/30/2015 - 08/30/2023
Tracking no: #ERC-285533274010

List of Establishments Under Selected DU's with 100 kW-Above Monthly Demand Relative to the CREM

Published by Energy Regulatory Commission(ERC) on Sept. 20, 2023.
Requested from ERC by R. Funtelar at 10:18 AM on Sept. 20, 2023.
Purpose: Research and Database Development
Date of Coverage: 01/01/2022 - 09/20/2023
Tracking no: #ERC-141932754401

Solar Plant Details

Published by Energy Regulatory Commission(ERC) on Sept. 18, 2023.
Requested from ERC by C. Estrada at 09:55 AM on Sept. 18, 2023.
Purpose: Research and development
Date of Coverage: 09/18/2010 - 09/18/2023
Tracking no: #ERC-745448159489

2022 Reliabilty Indices (SAIFI, SAIDI, and MAIFI) of Philippine Distribution Utilities

Published by Energy Regulatory Commission(ERC) on Sept. 13, 2023.
Requested from ERC by J. Orsal at 02:11 PM on Sept. 13, 2023.
Purpose: Research
Date of Coverage: 01/01/2022 - 12/31/2022
Tracking no: #ERC-320351854635

2023 CREM Report

Published by Energy Regulatory Commission(ERC) on Sept. 13, 2023.
Requested from ERC by C. Mariazeta at 08:55 AM on Sept. 13, 2023.
Purpose: Monitoring
Date of Coverage: 01/26/2023 - 08/25/2023
Tracking no: #ERC-760652482912

List of Establishments with 100 KW-Above Monthly Demand from Selected Distribution Utilities

Published by Energy Regulatory Commission(ERC) on Sept. 12, 2023.
Requested from ERC by R. Funtelar at 05:47 PM on Sept. 12, 2023.
Purpose: Research and Database Development
Date of Coverage: 08/01/2023 - 09/12/2023
Tracking no: #ERC-408376389395

Distribution Metering Requirements

Published by Energy Regulatory Commission(ERC) on Sept. 12, 2023.
Requested from ERC by N. Hermano at 03:47 PM on Sept. 12, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2022 - 08/30/2023
Tracking no: #ERC-709495050720

Information about Relialibility Index

Published by Energy Regulatory Commission(ERC) on Sept. 12, 2023.
Requested from ERC by S. Fabillar at 10:58 AM on Sept. 12, 2023.
Purpose: Research and development
Date of Coverage: 01/01/2013 - 12/31/2022
Tracking no: #ERC-896230021134

Plan, bidding, and eligibility documents of Meralco smart meters

Published by Energy Regulatory Commission(ERC) on Sept. 12, 2023.
Requested from ERC by N. Hermano at 10:05 AM on Sept. 12, 2023.
Purpose: Research and development
Date of Coverage: 01/01/2022 - 08/30/2023
Tracking no: #ERC-116258173473

List of gas/fuel stations in Southern Leyte and its location

Published by Energy Regulatory Commission(ERC) on Sept. 11, 2023.
Requested from ERC by J. Payot at 03:28 PM on Sept. 11, 2023.
Purpose: Thesis Project
Date of Coverage: 01/01/2021 - 09/11/2023
Tracking no: #ERC-638722629151

SMART METER MERALCO

Published by Energy Regulatory Commission(ERC) on Sept. 11, 2023.
Requested from ERC by K. Bonostro at 02:57 PM on Sept. 11, 2023.
Purpose: we want to study the TOR of the said bidding
Date of Coverage: 06/01/2023 - 09/11/2023
Tracking no: #ERC-158118393127

Electrical supply/power sources in Southern Leyte and its location

Published by Energy Regulatory Commission(ERC) on Sept. 10, 2023.
Requested from ERC by J. Payot at 04:28 PM on Sept. 10, 2023.
Purpose: Thesis Project
Date of Coverage: 01/01/2021 - 09/10/2023
Tracking no: #ERC-823433623134

Updated list of Contestable Customers with direct connection with NGCP

Published by Energy Regulatory Commission(ERC) on Sept. 5, 2023.
Requested from ERC by P. Roldan at 12:20 PM on Sept. 5, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2010 - 08/01/2023
Tracking no: #ERC-100122607934

Plan, bidding and eligibility documents of Project: Meralco smart meters

Published by Energy Regulatory Commission(ERC) on Sept. 5, 2023.
Requested from ERC by E. Hoo at 11:30 AM on Sept. 5, 2023.
Purpose: Research
Date of Coverage: 01/01/2023 - 08/31/2023
Tracking no: #ERC-259054441883

Request for copies of CAPEX Filings for selected PDU from 2020-2023

Published by Energy Regulatory Commission(ERC) on Sept. 5, 2023.
Requested from ERC by D. De Mesa at 09:32 AM on Sept. 5, 2023.
Purpose: Research and Development (Academic)
Date of Coverage: 01/01/2020 - 09/05/2023
Tracking no: #ERC-396162649187

Electricity

Published by Energy Regulatory Commission(ERC) on Sept. 3, 2023.
Requested from ERC by A. Entera at 09:36 AM on Sept. 3, 2023.
Purpose: Architectural Capstone
Date of Coverage: 08/31/2020 - 08/31/2023
Tracking no: #ERC-160871770315

Hourly Energy Demand of Albay and Sorsogon Provinces in 2021 and 2022

Published by Energy Regulatory Commission(ERC) on Sept. 1, 2023.
Requested from ERC by J. Calayan at 09:26 PM on Sept. 1, 2023.
Purpose: Academic Purposes (Electrical Engineering)
Date of Coverage: 09/01/2015 - 09/01/2023
Tracking no: #ERC-551855368880

Yearly, Monthly, and Daily Load Survey of Electricity Consumption in Batangas City

Published by Energy Regulatory Commission(ERC) on Sept. 1, 2023.
Requested from ERC by E. Aguinaldo Iii at 11:30 AM on Sept. 1, 2023.
Purpose: To utilize load survey data obtained from Meralco for our academic capstone design
Date of Coverage: 01/01/2023 - 09/01/2023
Tracking no: #ERC-232552633180

Yearly, Monthly, and Daily Load Survey in Batangas City

Published by Energy Regulatory Commission(ERC) on Sept. 1, 2023.
Requested from ERC by E. Aguinaldo Iii at 11:16 AM on Sept. 1, 2023.
Purpose: Our academic project utilizes utility load survey data to optimize plant design feasibility
Date of Coverage: 01/01/2021 - 09/01/2023
Tracking no: #ERC-063795844592

ERC Case No. 2016-129 RC

Published by Energy Regulatory Commission(ERC) on Aug. 31, 2023.
Requested from ERC by C. Andaya at 12:46 PM on Aug. 31, 2023.
Purpose: Research and Monitoring
Date of Coverage: 05/29/2018 - 05/29/2018
Tracking no: #ERC-645576314310

ERC Case No. 2012-087 RC

Published by Energy Regulatory Commission(ERC) on Aug. 31, 2023.
Requested from ERC by C. Andaya at 12:08 PM on Aug. 31, 2023.
Purpose: Research
Date of Coverage: 12/17/2012 - 12/17/2012
Tracking no: #ERC-924484758264

List of entities that have been issued with a COC, PAO, and RES License

Published by Energy Regulatory Commission(ERC) on Aug. 30, 2023.
Requested from ERC by F. Farinas at 05:22 PM on Aug. 30, 2023.
Purpose: For Research
Date of Coverage: 01/01/2018 - 08/30/2023
Tracking no: #ERC-157306407938

ERC Case No. 2018-013 RC

Published by Energy Regulatory Commission(ERC) on Aug. 30, 2023.
Requested from ERC by G. Requierme at 11:50 AM on Aug. 30, 2023.
Purpose: Research
Date of Coverage: 05/26/2022 - 05/26/2022
Tracking no: #ERC-508167662298

Electrical Meter Standards and Specifications

Published by Energy Regulatory Commission(ERC) on Aug. 30, 2023.
Requested from ERC by N. Hermano at 10:19 AM on Aug. 30, 2023.
Purpose: Product research and development
Date of Coverage: 01/01/2022 - 08/30/2023
Tracking no: #ERC-724714522936

Electrical Supply Data in Southern Leyte

Published by Energy Regulatory Commission(ERC) on Aug. 28, 2023.
Requested from ERC by J. Payot at 03:59 PM on Aug. 28, 2023.
Purpose: Thesis Project
Date of Coverage: 01/01/2020 - 08/28/2023
Tracking no: #ERC-888169844320

annex A of the PSA between MERALCO and SPTC

Published by Energy Regulatory Commission(ERC) on Aug. 24, 2023.
Requested from ERC by C. Zalsos at 08:58 AM on Aug. 24, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2019 - 08/24/2023
Tracking no: #ERC-099881972618

Energy Metering in Electric Coops

Published by Energy Regulatory Commission(ERC) on Aug. 23, 2023.
Requested from ERC by J. Laggui at 10:10 PM on Aug. 23, 2023.
Purpose: Research and Development (Metering)
Date of Coverage: 08/06/2023 - 08/18/2023
Tracking no: #ERC-248205928964

ERC Case No. 2023-085 RC

Published by Energy Regulatory Commission(ERC) on Aug. 23, 2023.
Requested from ERC by C. Gigante at 12:04 PM on Aug. 23, 2023.
Purpose: Research and development
Date of Coverage: 01/01/2023 - 08/23/2023
Tracking no: #ERC-699288193454

ERC Case No. 2022-019 RC

Published by Energy Regulatory Commission(ERC) on Aug. 22, 2023.
Requested from ERC by C. Ymas at 01:30 PM on Aug. 22, 2023.
Purpose: Research
Date of Coverage: 01/01/2022 - 12/31/2022
Tracking no: #ERC-691492062846

Power Supply Agreement (PSA)

Published by Energy Regulatory Commission(ERC) on Aug. 18, 2023.
Requested from ERC by A. Salazar at 10:29 PM on Aug. 18, 2023.
Purpose: Legal research on the electricity generation industry.
Date of Coverage: 01/01/2023 - 08/18/2023
Tracking no: #ERC-825277782930

VECO CONSUMER CONTRACT

Published by Energy Regulatory Commission(ERC) on Aug. 13, 2023.
Requested from ERC by J. Sadagnot at 01:58 AM on Aug. 13, 2023.
Purpose: Documentation
Date of Coverage: 08/01/1996 - 08/13/2023
Tracking no: #ERC-731282798750

Regulatory process of power plants and exceptions to connecting to end-users

Published by Energy Regulatory Commission(ERC) on Aug. 10, 2023.
Requested from ERC by J. Valiente at 03:22 PM on Aug. 10, 2023.
Purpose: Energy policy research
Date of Coverage: 01/01/2001 - 07/05/2023
Tracking no: #ERC-442350299979

La Union Electric Company, Inc.

Published by Energy Regulatory Commission(ERC) on Aug. 10, 2023.
Requested from ERC by E. Mateo at 01:27 PM on Aug. 10, 2023.
Purpose: For Research Paper
Date of Coverage: 01/01/2021 - 01/23/2021
Tracking no: #ERC-399154058730

Financial Statements for 2011-2023

Published by Energy Regulatory Commission(ERC) on Aug. 4, 2023.
Requested from ERC by L. Edig at 04:14 PM on Aug. 4, 2023.
Purpose: Legal Research
Date of Coverage: 01/01/2011 - 12/31/2022
Tracking no: #ERC-323494566915

Rules of Procedure in the ERC

Published by Energy Regulatory Commission(ERC) on Aug. 3, 2023.
Requested from ERC by L. Relampagos at 10:20 PM on Aug. 3, 2023.
Purpose: Student research
Date of Coverage: 01/01/2020 - 08/01/2023
Tracking no: #ERC-420027968275

Audited Financial Statements - Ilocos Sur Electric Cooperative, Inc.

Published by Energy Regulatory Commission(ERC) on Aug. 2, 2023.
Requested from ERC by Z. Abanes at 05:04 PM on Aug. 2, 2023.
Purpose: Research
Date of Coverage: 01/01/2022 - 12/31/2022
Tracking no: #ERC-679733683961

Statement of Collection and Expenditures for RFCAPEX

Published by Energy Regulatory Commission(ERC) on Aug. 1, 2023.
Requested from ERC by L. Edig at 07:26 AM on Aug. 1, 2023.
Purpose: Consumer complaint lodged with the ERC - Mindanao Operations Division
Date of Coverage: 01/01/2012 - 08/01/2023
Tracking no: #ERC-192328819449

List of Potential Contestable Customers in Mindanao

Published by Energy Regulatory Commission(ERC) on July 31, 2023.
Requested from ERC by D. Plaza at 02:03 PM on July 31, 2023.
Purpose: Market Research and Profiling
Date of Coverage: 07/30/2022 - 07/30/2023
Tracking no: #ERC-352276942494

DU Suppliers Data

Published by Energy Regulatory Commission(ERC) on July 26, 2023.
Requested from ERC by C. Estrada at 01:13 PM on July 26, 2023.
Purpose: Research and development
Date of Coverage: 01/01/2022 - 07/26/2023
Tracking no: #ERC-846425087396

Generation Data and Forced Outage Rates of Power Plants

Published by Energy Regulatory Commission(ERC) on July 22, 2023.
Requested from ERC by R. Dipasupil at 07:54 PM on July 22, 2023.
Purpose: Undergraduate Research and Development
Date of Coverage: 01/01/2013 - 06/27/2023
Tracking no: #ERC-090503351390

Reliability Indices of CAPALCO in Cagayan de Oro

Published by Energy Regulatory Commission(ERC) on July 19, 2023.
Requested from ERC by S. Fabillar at 04:19 PM on July 19, 2023.
Purpose: research and development
Date of Coverage: 01/01/2012 - 12/31/2022
Tracking no: #ERC-413616320567

Supplier and Transmission Data

Published by Energy Regulatory Commission(ERC) on July 17, 2023.
Requested from ERC by A. Delmo at 07:57 PM on July 17, 2023.
Purpose: Research
Date of Coverage: 06/01/2022 - 06/30/2023
Tracking no: #ERC-711645063126

REQUEST FOR THE NO. OF EMPLOYEES WHO ARE LICENSED HEALTH PROFESSIONALS WORKING IN YOUR AGENCY/OFFICE

Published by Energy Regulatory Commission(ERC) on July 14, 2023.
Requested from ERC by J. Villalobos at 11:22 AM on July 14, 2023.
Purpose: Health Workforce Planning and Policy Development
Date of Coverage: 07/14/2023 - 07/14/2023
Tracking no: #ERC-157644416225

2022 System Loss for Philippine Distribution Utilities (Private and EC)

Published by Energy Regulatory Commission(ERC) on July 12, 2023.
Requested from ERC by J. Orsal at 02:24 PM on July 12, 2023.
Purpose: Research
Date of Coverage: 01/01/2022 - 12/31/2022
Tracking no: #ERC-078421237888

retail electricity supplier on LGUs

Published by Energy Regulatory Commission(ERC) on July 11, 2023.
Requested from ERC by A. Victoria at 10:57 AM on July 11, 2023.
Purpose: Research and Development
Date of Coverage: 07/11/2023 - 07/11/2023
Tracking no: #ERC-571451089113

Sub Metering Policy - DU Companies

Published by Energy Regulatory Commission(ERC) on July 6, 2023.
Requested from ERC by J. Laggui at 09:56 PM on July 6, 2023.
Purpose: Metering and Billing
Date of Coverage: 07/06/2023 - 07/06/2023
Tracking no: #ERC-009792634750

Requesting Annual Report

Published by Energy Regulatory Commission(ERC) on July 6, 2023.
Requested from ERC by Y. Yeoh at 12:04 PM on July 6, 2023.
Purpose: Research and development
Date of Coverage: 01/01/2020 - 12/31/2022
Tracking no: #ERC-387739147161

Electricty price

Published by Energy Regulatory Commission(ERC) on July 6, 2023.
Requested from ERC by V. Castillo at 08:20 AM on July 6, 2023.
Purpose: Research
Date of Coverage: 01/01/2014 - 07/06/2023
Tracking no: #ERC-022287113522

Latest List of Potential Contestable Customers in Mindanao

Published by Energy Regulatory Commission(ERC) on July 5, 2023.
Requested from ERC by E. Vinuya at 08:53 AM on July 5, 2023.
Purpose: Research
Date of Coverage: 07/05/2023 - 07/05/2023
Tracking no: #ERC-159787776278

Request for Information: Copy of Research Studies on Electric Vehicle Policy

Published by Energy Regulatory Commission(ERC) on July 2, 2023.
Requested from ERC by R. Lingat at 03:32 PM on July 2, 2023.
Purpose: Research and study for future development
Date of Coverage: 07/01/2010 - 07/02/2023
Tracking no: #ERC-326352560333

Request for Definition

Published by Energy Regulatory Commission(ERC) on June 29, 2023.
Requested from ERC by J. Ceracas at 01:48 PM on June 29, 2023.
Purpose: Research
Date of Coverage: 06/29/2023 - 06/29/2023
Tracking no: #ERC-474934685696

Capacity Credit for Philippine Solar Farms

Published by Energy Regulatory Commission(ERC) on June 27, 2023.
Requested from ERC by R. Dipasupil at 02:05 PM on June 27, 2023.
Purpose: Undergraduate Research Project
Date of Coverage: 01/01/2013 - 06/27/2023
Tracking no: #ERC-643570159969

Competitive Retail Electricity Market report

Published by Energy Regulatory Commission(ERC) on June 26, 2023.
Requested from ERC by E. San Pedro at 03:54 PM on June 26, 2023.
Purpose: Research and development
Date of Coverage: 03/01/2023 - 03/31/2023
Tracking no: #ERC-697155497144

Power Supply Contracts of GNPower Kauswagan

Published by Energy Regulatory Commission(ERC) on June 26, 2023.
Requested from ERC by M. Benavidez at 10:04 AM on June 26, 2023.
Purpose: MBA study/Research
Date of Coverage: 01/01/2020 - 06/20/2023
Tracking no: #ERC-424660059346

Average Monthly Electricity Rates (in PHP/kWh) of Selected Distribution Utilities

Published by Energy Regulatory Commission(ERC) on June 22, 2023.
Requested from ERC by J. Young at 06:02 PM on June 22, 2023.
Purpose: Research
Date of Coverage: 01/01/2020 - 06/22/2023
Tracking no: #ERC-537508457630

Updated total System Size and number of Qualified End User under NET METERING Program for Solar

Published by Energy Regulatory Commission(ERC) on June 22, 2023.
Requested from ERC by K. De Leon at 03:45 PM on June 22, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2015 - 05/31/2023
Tracking no: #ERC-608073865732

Annual Power and Energy Statistics of Solar in PH as of end of 2022

Published by Energy Regulatory Commission(ERC) on June 22, 2023.
Requested from ERC by K. De Leon at 03:25 PM on June 22, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2005 - 12/31/2022
Tracking no: #ERC-385874931734

Electrical Energy Consumption on District I (Siargao Islands) of Surigao del Norte

Published by Energy Regulatory Commission(ERC) on June 21, 2023.
Requested from ERC by A. Aguila at 03:28 PM on June 21, 2023.
Purpose: Research
Date of Coverage: 01/01/2015 - 12/31/2019
Tracking no: #ERC-600992424421

ERC-Approved Rates Per Technology for National Capital Region

Published by Energy Regulatory Commission(ERC) on June 15, 2023.
Requested from ERC by J. Robin at 01:11 PM on June 15, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2022 - 06/15/2023
Tracking no: #ERC-152089244075

Audited status of 120 Power Supply Agreements subject to the alyansa ruling

Published by Energy Regulatory Commission(ERC) on June 8, 2023.
Requested from ERC by J. Baligad at 10:24 AM on June 8, 2023.
Purpose: Research
Date of Coverage: 01/01/2016 - 05/16/2023
Tracking no: #ERC-736631895932

Customer Feedback on Prepaid Electricity Service of MERALCO

Published by Energy Regulatory Commission(ERC) on June 7, 2023.
Requested from ERC by M. Papa at 08:31 PM on June 7, 2023.
Purpose: Research
Date of Coverage: 01/01/2014 - 12/01/2015
Tracking no: #ERC-090170982340

Study of the effect of fuel cost on the generation rate

Published by Energy Regulatory Commission(ERC) on June 2, 2023.
Requested from ERC by E. Uy at 10:52 AM on June 2, 2023.
Purpose: Research Paper
Date of Coverage: 01/01/2021 - 06/01/2023
Tracking no: #ERC-082451198249

Information about Meralco

Published by Energy Regulatory Commission(ERC) on June 2, 2023.
Requested from ERC by S. Fabillar at 08:22 AM on June 2, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2012 - 12/31/2022
Tracking no: #ERC-238953367538

CAPEX filing documents of FLECO (covered in 2010-2023)

Published by Energy Regulatory Commission(ERC) on June 1, 2023.
Requested from ERC by C. Rine at 04:35 PM on June 1, 2023.
Purpose: Research Paper
Date of Coverage: 01/01/2010 - 06/01/2023
Tracking no: #ERC-422736656683

Study on Retail Rate and Unbundled Rate of Electric Cooperatives

Published by Energy Regulatory Commission(ERC) on June 1, 2023.
Requested from ERC by C. Rine at 04:31 PM on June 1, 2023.
Purpose: Research Paper
Date of Coverage: 01/01/2010 - 12/31/2016
Tracking no: #ERC-428069308434

Reliability Indices of Meralco in Imus Cavite

Published by Energy Regulatory Commission(ERC) on May 31, 2023.
Requested from ERC by S. Fabillar at 10:15 AM on May 31, 2023.
Purpose: Research and Development
Date of Coverage: 01/01/2012 - 12/31/2022
Tracking no: #ERC-361334902023

Required Data for Provincial Product Account 2023

Published by Energy Regulatory Commission(ERC) on May 31, 2023.
Requested from ERC by M. Lalangan at 09:59 AM on May 31, 2023.
Purpose: Provincial Product Account 2023 of Philippines Statistic Authority
Date of Coverage: 01/01/2018 - 12/31/2022
Tracking no: #ERC-886907747511

Equation on how to calculate transmission charge and transmission rate

Published by Energy Regulatory Commission(ERC) on May 25, 2023.
Requested from ERC by E. Tanguilan at 07:12 PM on May 25, 2023.
Purpose: Research and Development
Date of Coverage: 05/25/2023 - 05/25/2023
Tracking no: #ERC-208889006325

Historical data on Monthly Electricity price/rate in the Philippines

Published by Energy Regulatory Commission(ERC) on May 25, 2023.
Requested from ERC by C. Temporal at 11:20 AM on May 25, 2023.
Purpose: Equity Research
Date of Coverage: 01/01/1990 - 12/31/2022
Tracking no: #ERC-057418211336

magnacarta for electricity consumer

Published by Energy Regulatory Commission(ERC) on May 18, 2023.
Requested from ERC by M. Casuco at 04:44 PM on May 18, 2023.
Purpose: for research paper
Date of Coverage: 05/09/2018 - 05/18/2023
Tracking no: #ERC-735036184951

ERC cases on QTP Service and Subsidy Agreements

Published by Energy Regulatory Commission(ERC) on May 17, 2023.
Requested from ERC by A. Gee at 10:35 PM on May 17, 2023.
Purpose: Market research
Date of Coverage: 01/01/2010 - 12/10/2019
Tracking no: #ERC-541995317708

Effective Rates per Distribution Utility

Published by Energy Regulatory Commission(ERC) on May 17, 2023.
Requested from ERC by M. Señir at 02:25 PM on May 17, 2023.
Purpose: news report
Date of Coverage: 01/01/2022 - 05/17/2023
Tracking no: #ERC-968502003991

Historical data on Monthly Electricity price/rate in the Philippines

Published by Energy Regulatory Commission(ERC) on May 15, 2023.
Requested from ERC by S. Hernandez at 01:42 AM on May 15, 2023.
Purpose: Thesis Data
Date of Coverage: 01/01/1990 - 12/31/2021
Tracking no: #ERC-997268479221

Latest Capacity Factor of Power Plants

Published by Energy Regulatory Commission(ERC) on May 12, 2023.
Requested from ERC by A. Zablan at 11:53 AM on May 12, 2023.
Purpose: Research and development
Date of Coverage: 01/01/2017 - 04/30/2023
Tracking no: #ERC-171390513173

About this agency

The Energy Regulatory Commission is an independent, quasi-judicial regulatory body of the electric power industry.

Make a Request
Agency Information Inventory

list of all available information