Department of Public Works and Highways

Browse over 5763 request from this government agency

architectural and structural plans of Mel Lopez Bridge II.

Published by Department of Public Works and Highways(DPWH) on Sept. 19, 2024.
Requested from DPWH by S. Servando at 01:42 AM on Sept. 19, 2024.
Purpose: Architectural Thesis
Tracking no: #DPWH-149161684290

Convention and Event Centers

Published by Department of Public Works and Highways(DPWH) on Sept. 18, 2024.
Requested from DPWH by D. Guanco at 05:26 PM on Sept. 18, 2024.
Purpose: Research / Thesis
Tracking no: #DPWH-094631490532

Follow Up on Progress of Flood Control Project in Fisla Village Acacia Carmen Cagayan de Oro

Published by Department of Public Works and Highways(DPWH) on Sept. 17, 2024.
Requested from DPWH by J. Sta Curz at 01:14 AM on Sept. 17, 2024.
Purpose: Public information and Follow up
Tracking no: #DPWH-193602131424

Regional Government Building Calamba

Published by Department of Public Works and Highways(DPWH) on Sept. 16, 2024.
Requested from DPWH by M. Fortu at 10:18 PM on Sept. 16, 2024.
Purpose: Architecture thesis
Tracking no: #DPWH-216178654291

Regional Government Building Calamba

Published by Department of Public Works and Highways(DPWH) on Sept. 15, 2024.
Requested from DPWH by M. Fortu at 10:46 PM on Sept. 15, 2024.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-401761916219

Soil Report

Published by Department of Public Works and Highways(DPWH) on Sept. 13, 2024.
Requested from DPWH by C. De Lemos at 10:07 PM on Sept. 13, 2024.
Purpose: Intended for our CE Design Project 1
Tracking no: #DPWH-373895385868

Soil Report at Brgy. Silangan, San Mateo Rizal

Published by Department of Public Works and Highways(DPWH) on Sept. 11, 2024.
Requested from DPWH by G. Cudapaz at 06:47 PM on Sept. 11, 2024.
Purpose: For Capstone Project/Thesis
Tracking no: #DPWH-303256691389

NLEX-Segment-8.2 HARBOR LINK PROJECT AND CIRCUMFERENCIAL ROAD 5 (C-5)

Published by Department of Public Works and Highways(DPWH) on Sept. 10, 2024.
Requested from DPWH by W. Chua at 11:02 PM on Sept. 10, 2024.
Purpose: Right Of Way (ROW) compensation for the Highway planed construction.
Tracking no: #DPWH-890940331893

list of project under my supervision as Materials Engineer and Provisional Project Engineer

Published by Department of Public Works and Highways(DPWH) on Sept. 10, 2024.
Requested from DPWH by B. Enero at 11:13 AM on Sept. 10, 2024.
Purpose: For reference and updating of my records
Tracking no: #DPWH-216749009609

Design guidelines for City Hall

Published by Department of Public Works and Highways(DPWH) on Sept. 10, 2024.
Requested from DPWH by E. Castro at 10:36 AM on Sept. 10, 2024.
Purpose: for Architectural Design 9 (Thesis)
Tracking no: #DPWH-957139196188

NLEX-Segment-8.2 HARBOR LINK PROJECT AND CIRCUMFERENCIAL ROAD 5 (C-5)

Published by Department of Public Works and Highways(DPWH) on Sept. 9, 2024.
Requested from DPWH by W. Chua at 11:01 PM on Sept. 9, 2024.
Purpose: Right Of Way (ROW) compensation for the Highway planed construction.
Tracking no: #DPWH-992090874283

Project Engineer

Published by Department of Public Works and Highways(DPWH) on Sept. 9, 2024.
Requested from DPWH by A. Perillo at 03:14 PM on Sept. 9, 2024.
Purpose: For verification
Tracking no: #DPWH-352136552747

Marikina City CLUP

Published by Department of Public Works and Highways(DPWH) on Sept. 7, 2024.
Requested from DPWH by C. Eribal at 05:42 PM on Sept. 7, 2024.
Purpose: Academic Research
Tracking no: #DPWH-646527189316

ACEL and Equipment Rental Rates

Published by Department of Public Works and Highways(DPWH) on Sept. 6, 2024.
Requested from DPWH by F. Caballo at 09:32 AM on Sept. 6, 2024.
Purpose: Reference for Estimation
Tracking no: #DPWH-099999984965

DPWH Latest ACEL Rates, CMPD and Standard Labor Rates

Published by Department of Public Works and Highways(DPWH) on Sept. 5, 2024.
Requested from DPWH by C. Del Monte at 02:31 PM on Sept. 5, 2024.
Purpose: This will be used to set a guide for our detailed cost estimate in site development and building construction for Bureau Veritas S.A.
Tracking no: #DPWH-173514249793

DPWH

Published by Department of Public Works and Highways(DPWH) on Sept. 5, 2024.
Requested from DPWH by C. Del Monte at 02:29 PM on Sept. 5, 2024.
Purpose: This will be used to set a guide for our detailed cost estimate in site development and building construction for Bureau Veritas S.A.
Tracking no: #DPWH-182781972907

The number of road accidents in Iligan City

Published by Department of Public Works and Highways(DPWH) on Sept. 5, 2024.
Requested from DPWH by J. Amboang at 11:54 AM on Sept. 5, 2024.
Purpose: Research and Development
Tracking no: #DPWH-552669434743

Blue Book Volume 1 to 3

Published by Department of Public Works and Highways(DPWH) on Sept. 5, 2024.
Requested from DPWH by A. Pallada at 09:17 AM on Sept. 5, 2024.
Purpose: For DPWH Project
Tracking no: #DPWH-138765205998

List of Projects under my name as Materials Engineer and Project Engineer

Published by Department of Public Works and Highways(DPWH) on Sept. 4, 2024.
Requested from DPWH by R. Valdez at 02:51 PM on Sept. 4, 2024.
Purpose: For verification
Tracking no: #DPWH-706876064187

Flood Control Projects of Naga City, Bicol as of September 2024

Published by Department of Public Works and Highways(DPWH) on Sept. 3, 2024.
Requested from DPWH by K. Tiambeng at 04:55 PM on Sept. 3, 2024.
Purpose: Research and Development
Tracking no: #DPWH-897718288499

Request for Traffic Data of Olivarez

Published by Department of Public Works and Highways(DPWH) on Sept. 3, 2024.
Requested from DPWH by A. Bueno at 11:33 AM on Sept. 3, 2024.
Purpose: Thesis/Research
Tracking no: #DPWH-183427143727

Road financed by mining

Published by Department of Public Works and Highways(DPWH) on Sept. 3, 2024.
Requested from DPWH by Y. Lemana at 11:05 AM on Sept. 3, 2024.
Purpose: Research and economic development
Tracking no: #DPWH-709545698507

Soil Report / Slope Protection

Published by Department of Public Works and Highways(DPWH) on Sept. 1, 2024.
Requested from DPWH by A. Anda at 05:56 PM on Sept. 1, 2024.
Purpose: Research And Development
Tracking no: #DPWH-241781134836

Request For Latest DPWH Construction Materials Unit Price List

Published by Department of Public Works and Highways(DPWH) on Aug. 31, 2024.
Requested from DPWH by J. Tuliao at 09:32 PM on Aug. 31, 2024.
Purpose: To be used in estimating construction material unit costs for the bill of quantities on my thesis project.
Tracking no: #DPWH-410695638572

me as contractor's ME

Published by Department of Public Works and Highways(DPWH) on Aug. 30, 2024.
Requested from DPWH by J. Barbosa at 08:59 AM on Aug. 30, 2024.
Purpose: verification
Tracking no: #DPWH-294860233046

Request for complete 2 storey building plan

Published by Department of Public Works and Highways(DPWH) on Aug. 27, 2024.
Requested from DPWH by V. Laurden at 02:49 PM on Aug. 27, 2024.
Purpose: Requirements for our Quantity Surveying subject. This will be used for academic purposes.
Tracking no: #DPWH-971392005644

CDP/CLUP OF VIGAN CITY

Published by Department of Public Works and Highways(DPWH) on Aug. 26, 2024.
Requested from DPWH by E. Malao at 11:29 AM on Aug. 26, 2024.
Purpose: Architectural Thesis
Tracking no: #DPWH-198522236098

Project Inquiry and Damage to Property

Published by Department of Public Works and Highways(DPWH) on Aug. 25, 2024.
Requested from DPWH by J. Sta Curz at 04:16 PM on Aug. 25, 2024.
Purpose: Inquiry on the Status and Property Damage from the Flood Control Project in Acacia, Carmen, Cagayan de Oro, Misamis Oriental, Region X 9000
Tracking no: #DPWH-520143244467

DEPTH OF MANATUTI RIVER SYSTEM

Published by Department of Public Works and Highways(DPWH) on Aug. 23, 2024.
Requested from DPWH by J. Bagonoc at 11:18 PM on Aug. 23, 2024.
Purpose: undergraduate thesis
Tracking no: #DPWH-974380123586

Soil Protection - Soil Report

Published by Department of Public Works and Highways(DPWH) on Aug. 23, 2024.
Requested from DPWH by A. Anda at 07:20 PM on Aug. 23, 2024.
Purpose: Research And Development.
Tracking no: #DPWH-909890992881

Soil Report at Magallanes, Cavite

Published by Department of Public Works and Highways(DPWH) on Aug. 23, 2024.
Requested from DPWH by G. Cudapaz at 06:50 PM on Aug. 23, 2024.
Purpose: Capstone Project (Educational Purposes)
Tracking no: #DPWH-563946597848

NAIAx

Published by Department of Public Works and Highways(DPWH) on Aug. 22, 2024.
Requested from DPWH by M. Rivera at 03:26 PM on Aug. 22, 2024.
Purpose: for school paper
Tracking no: #DPWH-403172028985

RROW Widths in Cebu City

Published by Department of Public Works and Highways(DPWH) on Aug. 22, 2024.
Requested from DPWH by J. Escalona at 09:41 AM on Aug. 22, 2024.
Purpose: Inquiry for Thesis Research
Tracking no: #DPWH-588515861457

List of Projects under my name as Materials Engineer

Published by Department of Public Works and Highways(DPWH) on Aug. 21, 2024.
Requested from DPWH by R. Poquiz at 04:59 PM on Aug. 21, 2024.
Purpose: To know if there is an unauthorized use of my license as masterials engineer.
Tracking no: #DPWH-158818175257

Project Engineer and Materials Engineer

Published by Department of Public Works and Highways(DPWH) on Aug. 20, 2024.
Requested from DPWH by V. Barbosa at 10:29 AM on Aug. 20, 2024.
Purpose: for verification purposes
Tracking no: #DPWH-064917562668

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on Aug. 19, 2024.
Requested from DPWH by L. Valeriano at 11:07 PM on Aug. 19, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-630106512447

PE and ME

Published by Department of Public Works and Highways(DPWH) on Aug. 19, 2024.
Requested from DPWH by J. Barbosa at 02:52 PM on Aug. 19, 2024.
Purpose: for Accreditation of the Contractors' and Consultants' Project Engineers
Tracking no: #DPWH-075435862878

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on Aug. 18, 2024.
Requested from DPWH by L. Valeriano at 11:07 PM on Aug. 18, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-908782014682

DUPA Reference

Published by Department of Public Works and Highways(DPWH) on Aug. 18, 2024.
Requested from DPWH by R. Azugui at 10:41 PM on Aug. 18, 2024.
Purpose: Budget Preparation and Review
Tracking no: #DPWH-565211576909

CLUP of DamsariƱas City Cavite

Published by Department of Public Works and Highways(DPWH) on Aug. 18, 2024.
Requested from DPWH by C. Bete at 07:48 PM on Aug. 18, 2024.
Purpose: research and development, school purposes
Tracking no: #DPWH-808276251298

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on Aug. 17, 2024.
Requested from DPWH by L. Valeriano at 11:07 PM on Aug. 17, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-871775211875

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on Aug. 16, 2024.
Requested from DPWH by L. Valeriano at 11:07 PM on Aug. 16, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-355502575372

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on Aug. 15, 2024.
Requested from DPWH by L. Valeriano at 11:05 PM on Aug. 15, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-146288745835

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on Aug. 14, 2024.
Requested from DPWH by L. Valeriano at 11:06 PM on Aug. 14, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-290194491573

QAU Report

Published by Department of Public Works and Highways(DPWH) on Aug. 14, 2024.
Requested from DPWH by M. San Diego at 04:04 PM on Aug. 14, 2024.
Purpose: Application of CC Project Engineer
Tracking no: #DPWH-613854272096

Information on the Cebu-Bohol bridge

Published by Department of Public Works and Highways(DPWH) on Aug. 14, 2024.
Requested from DPWH by J. Parco at 02:43 PM on Aug. 14, 2024.
Purpose: for Research purposes
Tracking no: #DPWH-694966098148

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on Aug. 14, 2024.
Requested from DPWH by L. Valeriano at 12:05 AM on Aug. 14, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-902078221401

List of project under my name as Project Engineer & Materials Engineer

Published by Department of Public Works and Highways(DPWH) on Aug. 13, 2024.
Requested from DPWH by A. Adian at 04:32 PM on Aug. 13, 2024.
Purpose: Good day, I would like to request for verification.
Tracking no: #DPWH-269237281555

CONSTRUCTORS PERFORMANCE SUMMARY REPORT

Published by Department of Public Works and Highways(DPWH) on Aug. 13, 2024.
Requested from DPWH by J. Ochoco at 01:13 PM on Aug. 13, 2024.
Purpose: For Upgrading of Contractors/Consultant's Project Engineer accreditation
Tracking no: #DPWH-875145620229

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on Aug. 13, 2024.
Requested from DPWH by L. Valeriano at 12:05 AM on Aug. 13, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-696042877253

International Roughness Index (IRI) Schedule and Cost

Published by Department of Public Works and Highways(DPWH) on Aug. 12, 2024.
Requested from DPWH by L. De Leon at 04:15 PM on Aug. 12, 2024.
Purpose: Research and Development
Tracking no: #DPWH-331805526332

Projects of DPWH wherein I am the Project Engineer

Published by Department of Public Works and Highways(DPWH) on Aug. 12, 2024.
Requested from DPWH by J. Go at 11:44 AM on Aug. 12, 2024.
Purpose: Personal use and accreditation.
Tracking no: #DPWH-211828141204

Inventory of Road and Ancillary Road Facilities in the City of Binan, Laguna

Published by Department of Public Works and Highways(DPWH) on Aug. 12, 2024.
Requested from DPWH by J. Dionisio at 09:41 AM on Aug. 12, 2024.
Purpose: For updating of the City of Binan's Comprehensive Development Plan (CDP)
Tracking no: #DPWH-470331095410

DPWH COntruction Materials and Labor Rates

Published by Department of Public Works and Highways(DPWH) on Aug. 12, 2024.
Requested from DPWH by I. Claveria at 08:58 AM on Aug. 12, 2024.
Purpose: Research and Develeopment
Tracking no: #DPWH-559491272854

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on Aug. 11, 2024.
Requested from DPWH by L. Valeriano at 04:41 PM on Aug. 11, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-224864769392

Request to Provide List of Project under my name as Materials Engineer and Project Engineer

Published by Department of Public Works and Highways(DPWH) on Aug. 10, 2024.
Requested from DPWH by K. Tarayao at 11:05 PM on Aug. 10, 2024.
Purpose: For Verification and Monitoring purpose.
Tracking no: #DPWH-760836132834

Jojee Yabut Request

Published by Department of Public Works and Highways(DPWH) on Aug. 10, 2024.
Requested from DPWH by J. Yabut at 01:59 PM on Aug. 10, 2024.
Purpose: For Verification purposes.
Tracking no: #DPWH-668956005506

Projects Pledged

Published by Department of Public Works and Highways(DPWH) on Aug. 9, 2024.
Requested from DPWH by A. Agripa at 04:35 PM on Aug. 9, 2024.
Purpose: For personal use and to verify id there is/are unauthorized use of my license and accreditation
Tracking no: #DPWH-489603577009

Projects handled

Published by Department of Public Works and Highways(DPWH) on Aug. 9, 2024.
Requested from DPWH by F. Balbona at 03:32 PM on Aug. 9, 2024.
Purpose: Personal use
Tracking no: #DPWH-204119485061

Project Impact Monitoring Reports ā€“ FRIMP-CDOR Contract Packages 1-3

Published by Department of Public Works and Highways(DPWH) on Aug. 8, 2024.
Requested from DPWH by K. Fabro at 01:03 PM on Aug. 8, 2024.
Purpose: Environmental Journalism
Tracking no: #DPWH-025443331435

MATERIALS AND PROJECT ENGINEER

Published by Department of Public Works and Highways(DPWH) on Aug. 8, 2024.
Requested from DPWH by A. Tamondong at 11:19 AM on Aug. 8, 2024.
Purpose: For verification of assignment
Tracking no: #DPWH-702645374833

Project Under my name

Published by Department of Public Works and Highways(DPWH) on Aug. 7, 2024.
Requested from DPWH by J. Belen at 01:15 PM on Aug. 7, 2024.
Purpose: for verification of my project
Tracking no: #DPWH-342798519343

DPWH-DUPA 2024

Published by Department of Public Works and Highways(DPWH) on Aug. 6, 2024.
Requested from DPWH by S. Mangida at 07:25 PM on Aug. 6, 2024.
Purpose: For Program of Works preparation for Barangay Projects adapting DPWH DUPA
Tracking no: #DPWH-646745695865

Structural Plan

Published by Department of Public Works and Highways(DPWH) on Aug. 5, 2024.
Requested from DPWH by J. Tuazon at 11:46 AM on Aug. 5, 2024.
Purpose: Thesis (CE - Project 1)
Tracking no: #DPWH-404176196376

Projects of DPWH under my name as the Project Engineer

Published by Department of Public Works and Highways(DPWH) on Aug. 3, 2024.
Requested from DPWH by J. Go at 09:23 AM on Aug. 3, 2024.
Purpose: Personal Use and data collection
Tracking no: #DPWH-798360027711

List of Projects Pledged

Published by Department of Public Works and Highways(DPWH) on Aug. 1, 2024.
Requested from DPWH by A. Agripa at 03:04 PM on Aug. 1, 2024.
Purpose: For Personal use and to verify if there is/are unauthorized use of my license in government projects
Tracking no: #DPWH-343319334289

Structural Plan Request

Published by Department of Public Works and Highways(DPWH) on July 31, 2024.
Requested from DPWH by J. Tuazon at 09:28 PM on July 31, 2024.
Purpose: to be used for Thesis (CE - Project 1 subject)
Tracking no: #DPWH-885822988070

Completed and on-going projects under my name as CCME1

Published by Department of Public Works and Highways(DPWH) on July 30, 2024.
Requested from DPWH by N. Wacas at 07:54 AM on July 30, 2024.
Purpose: For reference
Tracking no: #DPWH-316747036082

Samal Island-Davao City Connector Project signed contract

Published by Department of Public Works and Highways(DPWH) on July 29, 2024.
Requested from DPWH by L. Bonzo at 08:13 AM on July 29, 2024.
Purpose: news article
Tracking no: #DPWH-982109140706

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on July 29, 2024.
Requested from DPWH by L. Valeriano at 12:03 AM on July 29, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-785526688075

DPWH Design Guidelines, Criteria and Standards (DGCS) 2015 Edition Volume 5 - Bridge Design

Published by Department of Public Works and Highways(DPWH) on July 29, 2024.
Requested from DPWH by L. Valeriano at 12:03 AM on July 29, 2024.
Purpose: Reference for thesis
Tracking no: #DPWH-961310131152

Request for Copy of 16DN0037 listed in the Infra List of DPWH projects

Published by Department of Public Works and Highways(DPWH) on April 12, 2024.
Requested from DPWH by M. Garrovillas at 09:11 PM on April 12, 2024.
Purpose: Confirmation with Rizal 1st District Engineering Office for filing proper cases with the adjudication board of DSHUD, that is HSAC-RAB IV-A and or litigation (civil or criminal) against some residents in Palmera II Dolores Taytay identified by a person with personal knowledge and or employees of Rizal 1st District Engineering Office
Tracking no: #DPWH-978034675439

Current List of Projects Under my Name as Accredited Materials Engineer-1

Published by Department of Public Works and Highways(DPWH) on April 12, 2024.
Requested from DPWH by D. Anuada at 06:59 PM on April 12, 2024.
Purpose: Verification purposes
Tracking no: #DPWH-982920494156

REQUEST FOR UPDATED CMPD, LABOR, AND EQUIPMENT RATES

Published by Department of Public Works and Highways(DPWH) on April 12, 2024.
Requested from DPWH by P. Perante at 09:57 AM on April 12, 2024.
Purpose: Reference for the cost estimation of current Philippine National Railways projects.
Tracking no: #DPWH-460006733791

FOLLOW UP WITH DPWH REQUESTS

Published by Department of Public Works and Highways(DPWH) on April 11, 2024.
Requested from DPWH by M. Garrovillas at 08:22 PM on April 11, 2024.
Purpose: Information/confirmation requested for filing the necessary litigation case and or mitigation with HSAC RAB IV A; however, if it can't be salvaged, litigation case shall be filed with the RTC (civil)
Tracking no: #DPWH-774079878079

FOLLOW UP ON PREVIOUS REQUESTS DPWH - 495140998941;

Published by Department of Public Works and Highways(DPWH) on April 11, 2024.
Requested from DPWH by M. Garrovillas at 08:06 PM on April 11, 2024.
Purpose: For filing necessary litigation (civil or criminal) and or HSAC RAB IV A; mitigation if within the jurisdiction of the adjudication body of DHSUD
Tracking no: #DPWH-971565986177

Puerto Princesa Port Study

Published by Department of Public Works and Highways(DPWH) on April 11, 2024.
Requested from DPWH by B. Godinez at 06:15 PM on April 11, 2024.
Purpose: Research paper
Tracking no: #DPWH-729966058327

Request to provide the list of Project under my name as Materials Engineer and Project Engineer

Published by Department of Public Works and Highways(DPWH) on April 11, 2024.
Requested from DPWH by A. Borda at 09:55 AM on April 11, 2024.
Purpose: Verification and Monitoring purposes
Tracking no: #DPWH-594349187393

Port Studies

Published by Department of Public Works and Highways(DPWH) on April 9, 2024.
Requested from DPWH by B. Godinez at 02:19 PM on April 9, 2024.
Purpose: End term report
Tracking no: #DPWH-901933625048

The Annual Average Daily Traffic (AADT) of Mariki-Infanta Higway kilometer 24.

Published by Department of Public Works and Highways(DPWH) on April 7, 2024.
Requested from DPWH by P. Calasara at 11:30 PM on April 7, 2024.
Purpose: Capstone Project / Thesis
Tracking no: #DPWH-131818857301

The Annual Average Daily Traffic in Marikina-Infanta Highway

Published by Department of Public Works and Highways(DPWH) on April 7, 2024.
Requested from DPWH by P. Calasara at 11:25 PM on April 7, 2024.
Purpose: Capstone Project / Thesis
Tracking no: #DPWH-730799104018

Soil Profile Type

Published by Department of Public Works and Highways(DPWH) on April 7, 2024.
Requested from DPWH by B. Bautista at 09:36 PM on April 7, 2024.
Purpose: For capstone project
Tracking no: #DPWH-746644661600

List of Goverment Projects

Published by Department of Public Works and Highways(DPWH) on April 7, 2024.
Requested from DPWH by M. Mahilum at 03:46 PM on April 7, 2024.
Purpose: Verificatiom
Tracking no: #DPWH-522329048526

firemen doing business on behalf of OBO

Published by Department of Public Works and Highways(DPWH) on April 7, 2024.
Requested from DPWH by H. Estremera at 10:17 AM on April 7, 2024.
Purpose: possible violations of government procedures and its legal implications
Tracking no: #DPWH-959759929707

Request for Information regarding the use of my name as Materials Engineer and Project Engineer.

Published by Department of Public Works and Highways(DPWH) on April 7, 2024.
Requested from DPWH by K. Tarayao at 10:01 AM on April 7, 2024.
Purpose: For verification and monitoring purposes
Tracking no: #DPWH-793185302737

List of Information regarding the use of my name as Materials Engineer and Project Engineer

Published by Department of Public Works and Highways(DPWH) on April 7, 2024.
Requested from DPWH by K. Tarayao at 09:50 AM on April 7, 2024.
Purpose: For verification and monitoring purposes
Tracking no: #DPWH-241989067193

Provide List Of Project Under My Name As Materials Engineer And Project Engineer

Published by Department of Public Works and Highways(DPWH) on April 7, 2024.
Requested from DPWH by K. Tarayao at 09:47 AM on April 7, 2024.
Purpose: For verification and monitoring purposes
Tracking no: #DPWH-753441213630

Request to Provide List of Project under my name as Materials Engineer and Project Engineer

Published by Department of Public Works and Highways(DPWH) on April 7, 2024.
Requested from DPWH by K. Tarayao at 09:35 AM on April 7, 2024.
Purpose: For verification and monitoring purposes
Tracking no: #DPWH-449815095253

Latest International Roughness Index and Total Length of Bike Lanes in Quezon City

Published by Department of Public Works and Highways(DPWH) on April 6, 2024.
Requested from DPWH by K. Espulgar at 09:13 PM on April 6, 2024.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-972185519045

Standard LED Traffic Signage

Published by Department of Public Works and Highways(DPWH) on April 6, 2024.
Requested from DPWH by M. Barola at 10:31 AM on April 6, 2024.
Purpose: Research and Development
Tracking no: #DPWH-473165457034

LATEST NATIONWIDE CONSTRUCTION MATERIALS PRICE DATA (CMPD)

Published by Department of Public Works and Highways(DPWH) on April 5, 2024.
Requested from DPWH by R. Pasia at 03:16 PM on April 5, 2024.
Purpose: For the preparation of costing of agricultural infrastructure facilities being implemented by the Department of Agriculture (DA)
Tracking no: #DPWH-287951672926

Latest International Roughness Index and Total Length of Bike Lanes in Quezon City

Published by Department of Public Works and Highways(DPWH) on April 5, 2024.
Requested from DPWH by K. Espulgar at 03:11 PM on April 5, 2024.
Purpose: Undergraduate Thesis
Tracking no: #DPWH-288374079153

Builing Assessment and Audit

Published by Department of Public Works and Highways(DPWH) on April 5, 2024.
Requested from DPWH by A. Vidallo at 07:17 AM on April 5, 2024.
Purpose: Academic Research
Tracking no: #DPWH-499724235087

Design of Soil Improvement to mitigate the risk of liquefaction of a high-rise condominium along sumulong highway brgy sto. nino, marikina city

Published by Department of Public Works and Highways(DPWH) on April 3, 2024.
Requested from DPWH by J. Mangaring at 06:44 PM on April 3, 2024.
Purpose: Thesis and Capstone
Tracking no: #DPWH-173326777198

List of Schools with Rainwater Harvesting Facilities in Quezon City

Published by Department of Public Works and Highways(DPWH) on April 2, 2024.
Requested from DPWH by S. Blanco at 10:00 PM on April 2, 2024.
Purpose: Research and Development
Tracking no: #DPWH-793657835051

Schools in Quezon City with Rainwater Harvesting Facilities

Published by Department of Public Works and Highways(DPWH) on April 2, 2024.
Requested from DPWH by S. Blanco at 05:33 PM on April 2, 2024.
Purpose: Research Proposal
Tracking no: #DPWH-591188432207

Approved and Completed Riprap project augmentation/rehabilitation from 2009-2019; intended for Palmera Homes II, Brgy Dolores, Taytay, Rizal; worth Php6.5 million or more

Published by Department of Public Works and Highways(DPWH) on April 2, 2024.
Requested from DPWH by M. Garrovillas at 04:22 AM on April 2, 2024.
Purpose: Research and for our local community paper within the subdivision
Tracking no: #DPWH-079122128233

GOVERNMENT PROJECTS UNDER ENGR. MELVEN AMOGUIS

Published by Department of Public Works and Highways(DPWH) on March 29, 2024.
Requested from DPWH by M. Amoguis at 05:25 PM on March 29, 2024.
Purpose: Transparency
Tracking no: #DPWH-374558148957

The Annual Average Daily Traffic In Layac Junction, Dinalupihan, Bataan.

Published by Department of Public Works and Highways(DPWH) on March 27, 2024.
Requested from DPWH by M. Edgardo Angelo at 03:14 AM on March 27, 2024.
Purpose: College Research
Tracking no: #DPWH-692081777297

Streamflow data of San Cristobal river and Santa Maria River

Published by Department of Public Works and Highways(DPWH) on March 25, 2024.
Requested from DPWH by H. Lunas at 05:26 PM on March 25, 2024.
Purpose: Thesis Study
Tracking no: #DPWH-168689823092

About this agency

The Department of Public Works and Highways ensures quality, efficiency, and safety of all infrastructures. It is responsible for the planning, design, construction, and maintenance of infrastructure, especially the national highways, flood control and water resources development system, and other public works in accordance with national development interest.

Make a Request
Agency Information Inventory

list of all available information