You have submitted an FOI request
Date: July 30, 2019, 8 a.m.
Your request is already in review
Your request was denied
Date: 2019-10-10 16:05:56.000000
How was your request?
Published by Mindanao Development Authority(MinDA) on July 30, 2019.
Requested from MinDA by S. Spalding at 08:00 AM on
July 30, 2019.
Purpose: Thesis/ Capstone
Date of Coverage: 07/29/2019 - 07/29/2019
Tracking no: #MinDA-083573984566
We are the 5th year civil engineering students from the Technological Institute of the Philippines (T.I.P) at Quezon City. Our culminating design requirement is a project in the field of water resource engineering. The project is a design of flood mitigation of Mindanao River on both right and left bank under Tunggol Bridge II located at Brgy. Tunggol, Datu Montawal, Maguindanao, considering multiple constraints, trade-offs, and standards to enable us to select the most economical, safest, and sustainable project.
No river profiling was conducted to the Pulanggi River